N˚Borehole

N˚Drillinge

Exploitation Flow Q (m3/h)

Porosity n

Thickness of the saturated layer H ou b (m)

Calculated radii (m) for different transfer times t

t = 50 days

t = 2 years

t = 5 years

FO 1

SEN 151

200

0.375

32.43

79.258

302.843

478.837

FO 2

SEN 159

200

0.375

35.47

75.785

289.575

457.858

FO 3

SEN 162

140

0.375

32.59

66.149

252.754

399.639

FO 4

SEN 165

140

0.375

29.54

69.480

265.482

419.764

FO 5

SEN 22

200

0.375

32.39

79.307

303.030

479.133

FO 6

SEN 19

200

0.375

35.4

75.860

289.861

458.311

FO 7

SEN 14

120

0.375

23.62

71.937

274.870

434.607

FO 8

SEN 05

200

0.375

26.57

87.563

334.577

529.012

FO 9

SEN 17

140

0.375

23.64

77.668

296.768

469.231

FO 10

SEN 09

140

0.375

29.68

69.316

264.855

418.773

FO 11

SEN 27

250

0.375

25.59

99.755

381.164

602.672

FO 12

SEN 68

100

0.375

23.66

65.613

250.709

396.405

FO 13

SEN 47

100

0.375

32.91

55.633

212.575

336.111

FO 14

SEN 41

100

0.375

29.59

58.672

224.184

354.466

FO 15

SEN 34

250

0.375

35.38

84.838

324.166

512.552

FO 16

SEN 31

200

0.375

32.22

79.516

303.829

480.395