Constant quantity (k) dummy row/column | Optimum allocations (xij) | Optimum total cost for BTP | k × supply/demand at dummy source/destination | Optimum total cost for UTP (TC) |
127 | , , , , , , ,
| 231,900 | 127 × 1700 = 215,900 | 16,000 |
225 | 398,500 | 225 × 1700 = 382,500 | ||
300 | 526,000 | 300 × 1700 = 510,000 |