Constant quantity (k) in dummy row/column | Optimum allocations (xij) | Optimum total cost for BTP | (k) × supply/demand at dummy source/destination | Optimum total cost for UTP (TC) |
150 | , , , , , ,
| 39,310 | 150 × 225 = 33,750 | 5560 |
1000 | 230,560 | 1000 × 225 = 225,000 | ||
1050 | 241,810 | 1050 × 225 = 236,250 |