Working Condition | Water diversion | Water drainage | ||||||||||||
Reservoir | Pumping station | Water gate | Note | |||||||||||
Xixia reservoir 104 m3/d | Jiaokou reservoir 104 m3/d | Gaoqiao pumping station 13.4 m3/s | Huangjiahe pumping station 1 m3/s | Wujiangkou pumping station m3/s | Shaojiadu pumping station m3/s | Tujiayan pumping station m3/s | Baofeng gate | Xingchun gate | Tujiayan gate | Fengpeng gate | ||||
1 |
| 15 | √ | √ |
|
|
| √ | √ | √ |
| Ecological drainage analysis of Xixia reservoir | ||
2 | 5 | 15 | √ | √ |
|
|
| √ | √ | √ |
| |||
3 | 10 | 15 | √ | √ |
|
|
| √ | √ | √ |
| |||
4 |
| 15 | √ | √ |
| 10 |
| √ | √ | √ |
| Water diversion analysis for Shaojiadu pumping station | ||
5 |
| 15 | √ | √ |
| 15 |
| √ | √ | √ |
| |||
6 |
| 15 | √ | √ |
| 20 |
| √ | √ | √ |
| |||
7 |
| 15 | √ | √ | 5 |
|
| √ | √ | √ |
| Water diversion analysis for Wujiangkou pumping station | ||
8 |
| 15 | √ | √ | 10 |
|
| √ | √ | √ |
| |||
9 |
| 15 | √ | √ | 15 |
|
| √ | √ | √ |
| |||
10 |
| 15 | √ | √ | 20 |
|
| √ | √ | √ |
| |||
11 |
| 15 | √ | √ |
|
| 5 | √ | √ | √ |
| Water diversion analysis for Tujiayan pumping station | ||
12 |
| 15 | √ | √ |
|
| 10 | √ | √ | √ |
| |||
13 |
| 15 | √ | √ |
|
| 20 | √ | √ | √ |
| |||
14 | 5 |
| √ | √ |
|
|
| √ | √ | √ |
| Drainage Analysis Of Fengpeng water gate | ||
15 | 5 |
| √ | √ |
|
|
| √ | √ | √ | √ | |||