Constructions

Reduction of natural frequencies

Jamboree bridge (USA) [8]

5% after 5 years for f1

West Street On-Ramp bridge [7]

7.5% after 8 years for f1 and f3

5% after 8 years for f2

Other examples from [11] :

A reinforced concrete bridge box girder

19% after 16 years

La Franconi bridge in Bratislava (Slovakia)

3% after 4 years

Reinforced concrete chimney (Prague)

0.1% after 9 months

0.6% after 1.4 years

2.6% after 2.6 years

7.6% after 3.6 years

Prestressed concrete bridge at Nusle

4.1% after 34 years

Stressed ribbon footbridge at Troja

1.5% after 11 years

Prestressed bridge over the Motor-Way D8 (Dresden)

10.4% after 15 years

High building in Vokovice

12% and 1.13% after 33 years

Prestressed bridge on the Brno Motor-Way D1

0% after 32 years