Code/requirements

Egyptian

Syrian

Saudi Arabian Code

Dead load

1.4

1.5

1.4

Live load

1.6

1.8

1.6

Combinations load

D = 0.8; L = 1.3

D = 0.8; L = 1.4

D = 1.2; L = 1.6

Geotechnical works

¾ All requirements and details for laboratory and field tests.

¾ Foundations design details and requirements depending on Egyptian and ACI code.

¾ All requirements and details for laboratory and field tests.

¾ Foundations design details and requirements depending on Syrian and Germany standards.

¾ All requirements and details for laboratory and field tests.

¾ Foundations design details and requirements depending on ASTM standards and IBC.

Materials

Materials are defined according to Egyptian standards.

Materials are defined according to Syrian standards.

Materials are defined according to ASTM standards.