Regression

coefficient

Standard

error

t value

p value

Intercept

−2.556 × 10−15

1.837 × 10−2

0

1

Length of train lines

0.1557

3.203 × 10−2

4.861

1.24 × 10−6

Length of through service sections

0.2304

2.957 × 10−2

7.792

9.64 × 10−15

Number of operating trains per hour during peak hours

−8.277 × 10−2

2.964 × 10−2

−2.793

0.00527

Number of transported passengers per hour during peak hours

0.1529

3.874 × 10−2

3.946

8.17 × 10−5

Number of stairs and escalators in terminal stations

−7.450 × 10−2

2.875 × 10−2

−2.591

0.00962

Number of trains according to type

−0.1309

2.577 × 10−2

−5.081

4.04 × 10−7

Number of connecting operation stations

−0.1155

5.112 × 10−2

−2.258

0.02400

Length of lines with connecting operation

0.1614

5.229 × 10−2

3.086

0.00205