Scenario | Flood area (m2) | F (%) | A - B (m2) | A∩B (m2) | A∪B (m2) | A∩B/A∪B |
Piping (B) | 15,931.3 | 54.8 | 3084.9 | 8857.2 | 16,398.2 | 0.54 |
Overtopping (B) | 11,918.4 | 59.0 | 2077.9 | 9864.2 | 12,552.9 | 0.79 |
Observed UAV (A) | 11,941.9 |
|
|
|
|
|