1

Tyton 150 pipeline L = 251 m

2

Tyton 150 pipeline L = 96 m

3

Tyton 200 pipeline L = 290 m

4

Tyton 200 pipeline L = 36 m

5

Tyton 300 pipeline L = 234 m

6

Tyton 200 pipeline L = 42 m

A

Bend 200, connected to the pipeline from both ends

B

200 - 300 culvert, connected to the pipeline from one end (mono)

C

Bend 300, connected to the pipeline from one end

D

200 to 300 culvert, connected to the pipeline from both ends (double)