Transport Equip

L/h

Fuel cost ($/h)

R & M per km

R & M ($/h)

Tires $/h

Labor cost ($/h)

Op cost ($/h)

Salvage value factor

Fixed cost ($/h)

Total cost ($/h)

CO2 kg/h

Small (6 wheel)

41.0

55.69

1.39

6.79

0.12

25.00

87.93

0.35

3.29

90.89

108

Medium (10 wheel)

49.5

66.83

1.39

6.79

0.20

25.00

99.07

0.35

4.94

103.76

130

Large (18 wheel)

57.8

77.97

1.39

6.79

0.35

25.00

110.20

0.35

7.36

117.48

152