Time Step 1 of Stress Period 1, Water Budget of the Whole Model Domain :

Flow Term

In

Out

In-Out

Storage

0.000e+00

0.000e+00

0.000e+00

Constant Head

1.188e+04

3.596e+04

−2.408e+04

Wells

6.546e+03

0.000e+00

6.546e+03

Drains

0.000e+00

6.661e+02

−6.661e+02

Recharge

1.853e+04

0.000e+00

1.853e+04

ET

0.000e+00

8.858e−01

−8.858e−01

River Leakage

9.009e−04

3.239e+02

−3.239e+02

Head Dep Bounds

0.000e+00

0.000e+00

0.000e+00

Stream Leakage

0.000e+00

0.000e+00

0.000e+00

Interbed Storage

0.000e+00

0.000e +00

0.000e+00

Reserv. Leakage

0.000e+00

0.000e+00

0.000e+00

Sum

3.695e+04

3.695e+04

−8.237e−01

Discrepancy [%]

0