No. | Item | Raw Data |
| Unit Emergy Value (sej/unit) |
| UEV source | Emergy (sej/yr) |
Construction | |||||||
Machinery for preparation | |||||||
1 | Bulldozer | 16,667 | g/yr | 2.20E+10 | sej/g | a | 3.67E+14 |
2 | Compactor | 13,333 | g/yr | 2.20E+10 | sej/g | a | 2.93E+14 |
3 | Truck | 8000 | g/yr | 2.20E+10 | sej/g | a | 1.76E+14 |
Materials used for the landfill preparation | |||||||
4 | Dry mud | 2.67E+06 | g/yr | 2.90E+09 | sej/g | b | 7.73E+15 |
5 | Clay | 8.00E+06 | g/yr | 2.90E+09 | sej/g | b | 2.32E+16 |
6 | Sand | 4.00E+06 | g/yr | 2.13E+09 | sej/g | b | 8.52E+15 |
Materials used for the office building construction | |||||||
7 | Sand | 5.83E+06 | g/yr | 2.13E+09 | sej/g | b | 1.24E+16 |
8 | Fire bricks | 3.00E+06 | g/yr | 3.70E+09 | sej/g | b | 1.11E+16 |
9 | Gravel | 7.00E+06 | g/yr | 2.13E+09 | sej/g | b | 1.49E+16 |
10 | Galvanised metal | 1.27E+07 | g/yr | 1.39E+10 | sej/g | c | 1.76E+17 |
11 | Sheet metal | 6.68E+04 | g/yr | 1.39E+10 | sej/g | c | 9.29E+14 |
12 | Concrete | 8.33E+05 | g/yr | 3.04E+09 | sej/g | d | 2.53E+15 |