Total

3.66E+16

SMW treated

1617.85

ton

Cost per ton of SMW

2.27E+13

USD/yr/ton

100.0

Landfill

Construction

Labor

3.93E+16

$/yr

3.55

Services

2.87E+16

$/yr

2.59

Operation

Labor

2.18E+17

$/yr

19.67

Services

1.26E+18

$/yr

74.18

Total

1.11E+18 (5222.53 Ton*)

SMW treated

1162.53 (22.26%)

Ton

Emergy cost for SMW

2.74E+17

Cost per ton of SMW

2.12E+14

USD/yr/ton

100.0

Incinerator

Construction

Labor

1.62E+16

$/yr

8.01

Services

1.92E+16

$/yr

9.50

Operation

Labor

5.41E+16

$/yr

26.75

Services

1.13E+17

$/yr

55.72

Total

2.02E+17

SMW treated

1284.365

ton

Cost per ton of SMW

1.57E+14

USD/yr/ton

100