Construction of section

Drilling parameters

Note

Angle (˚)

Orientation (˚)

Depth (m)

No. 1 drilling

0

90

100

Place the receivers

No. 2 drilling

0

90

80

Place the sources

No. 3 drilling

−5

90

100

Place the receivers