Factors

Literature author

1. Cost of prefabricated buildings

(Jabar et al., 2013) ,

(Murray et al., 2003) ,

(Loss et al., 2016b) ,

(Mohammad, 2013) ,

(Marasini et al., 2001)

2. Prefabricated building construction technology

3. Professional quality inspection equipment

4. Relevant experience of Engineering Manager

5. Coordination and cooperation of participants

6. Weather environment

7. Unreasonable component installation

8. The space for installation on the construction site is limited

9. The handover of procedures during construction is ambiguous

10. Rough schedule and work arrangement

11. Unqualified production materials

12. Lack of experience of quality inspectors

13. Relevant policies are not perfect

14. professional and technical personnel

15. preliminary planning