Factors | Literature author |
1. Cost of prefabricated buildings | |
2. Prefabricated building construction technology | |
3. Professional quality inspection equipment | |
4. Relevant experience of Engineering Manager | |
5. Coordination and cooperation of participants | |
6. Weather environment | |
7. Unreasonable component installation | |
8. The space for installation on the construction site is limited | |
9. The handover of procedures during construction is ambiguous | |
10. Rough schedule and work arrangement | |
11. Unqualified production materials | |
12. Lack of experience of quality inspectors | |
13. Relevant policies are not perfect | |
14. professional and technical personnel | |
15. preliminary planning |