| Factors |
Literature author |
| 1. Cost of prefabricated buildings |
|
| 2. Prefabricated building construction technology |
|
| 3. Professional quality inspection equipment |
|
| 4. Relevant experience of Engineering Manager |
|
| 5. Coordination and cooperation of participants |
|
| 6. Weather environment |
|
| 7. Unreasonable component installation |
|
| 8. The space for installation on the construction site is limited |
|
| 9. The handover of procedures during construction is ambiguous |
|
| 10. Rough schedule and work arrangement |
|
| 11. Unqualified production materials |
|
| 12. Lack of experience of quality inspectors |
|
| 13. Relevant policies are not perfect |
|
| 14. professional and technical personnel |
|
| 15. preliminary planning |