| Factors | Literature author |
| 1. Cost of prefabricated buildings | |
| 2. Prefabricated building construction technology | |
| 3. Professional quality inspection equipment | |
| 4. Relevant experience of Engineering Manager | |
| 5. Coordination and cooperation of participants | |
| 6. Weather environment | |
| 7. Unreasonable component installation | |
| 8. The space for installation on the construction site is limited | |
| 9. The handover of procedures during construction is ambiguous | |
| 10. Rough schedule and work arrangement | |
| 11. Unqualified production materials | |
| 12. Lack of experience of quality inspectors | |
| 13. Relevant policies are not perfect | |
| 14. professional and technical personnel | |
| 15. preliminary planning |