Method

Average of PoCIR

Grand Average of PoCIR

(GAPoCIR)

Cost Minimization

(Balanced Problems)

Cost Minimization

(Unbalanced Problems)

Profit

Maximization

NWCR

50.90

48.29

72.01

57.07

LCM

93.74

86.65

99.44

93.28

VAM

96.37

94.67

99.78

96.94

IAM

97.87

95.92

99.80

97.87