Year

Activity

2002

Seismic campaign, including Temane, Pande and Inhassoro

2003/2004

Drilling campaign, including Temane production wells, and Inhassoro, Temane and Pande exploration wells

2005

Seismic campaign, including infill of the 2002 campaign plus areas north of the Save River

2006/2008

Drilling campaign and construction project, including development of the Pande field, appraisal of existing discoveries and further exploration of the Exploration Block

2009

Production Sharing Area seismic acquisition campaign, covering areas in the south and north of the Exploration Block.

2010/2011

Drilling campaign, including two exploration wells located north of the Save River and south of Temane, respectively, one horizontal appraisal well in Inhassoro, and a new produced water re-injection well at the CPF to replace T-22 field.