SI.No

Power demand

Total cost using GA method

Total cost using hybrid method

MW

$/hr

$/hr

1

150

513.9195

459.7613

2

180

801.8116

548.0276

3

200

771.6955

377.6988

4

230

711.1035

703.5854

5

250

755.7312

685.5941

6

260

801.1265

736.6453

7

300

858.1526

851.3701

8

340

981.0335

909.1563

9

350

1298.1529

1051.7908

10

400

1132.032

1077.1109