Inputs | Targets | Outputs | |||||||||
(ton/cm2) | (ton/cm2) | wd (ton/m) | L (m) | b (m) | d (m) | ρ1 | ρ2 | Cost (103 NT$) | ρ1 | ρ2 | Cost (103 NT$) |
2.8 | 0.28 | 2.7 | 6 | 0.2018 | 0.6309 | 0.0080 | 0.0149 | 6.904 | 0.0079 | 0.0147 | 6.870 |
3.5 | 0.21 | 2.3 | 6 | 0.2000 | 0.6617 | 0.0055 | 0.0102 | 6.051 | 0.0055 | 0.0103 | 6.094 |
4.2 | 0.35 | 2.1 | 8 | 0.2006 | 0.7178 | 0.0065 | 0.0121 | 9.115 | 0.0065 | 0.0118 | 9.279 |