Plant Name

Year

Energy Generation (MUs)

Deviation

Average deviations of two years

Actual

Simulation using data from Meteonorm

Kolar3 MW

2012

4.07

4.45

−9.34%

−4.78%

2013

4.44

4.45

−0.23%

Belgaum 3 MW

2012

3.49

3.71

−6.30%

−3.97%

2013

3.65

3.71

−1.64%

Raichur 3 MW

2012

3.29

3.55

−7.90%

−4.09%

2013

3.54

3.55

−0.28%

Mandya 5 MW

2013

7.02

7.34

−4.56%

−4.56%