Cost components

Fixed proportion (%)

Variable proportion (%)

Drilling preparation

100

0

Drilling

1.7

98.3

Cementing

13.6

86.4

Subtotal

7.5

92.5

Logging

1.5

98.5

Well logging

0

100

Perforation

0

100

Party A

100

0

Mean value

29.5

70.5