VES Nos.

Resistivity ρ(Ωm)

Aquifer Depth (m)

Thickness

(m)

Electrical Conductivity

(Ωm)−1 × 10−3

Longitudinal Conductance S(Ω)−1 × 10−2

Hydraulic Conductivity

(m/day)

Transmissivity

(m2/day)

Line 1

265.0

68.50

39.00

3.77

14.7

66.50

2593.50

Line 2

213.0

67.90

37.60

4.69

17.70

1002.24

37,684.22

Line 3

508.0

67.30

36.50

1.97

7.20

120.96

4415.04

Line 4

580.0

66.20

36.50

1.72

6.30

71.37

2605.01

Line 5

158.0

53.10

37.00

6.33

23.40

1486.08

54,984.96

Line 6

161.0

69.10

37.80

6.21

23.50

1451.52

54,867.46

Line 7

140.0

70.40

39.20

7.14

28.00

1693.44

66,382.85

Line 8

132.0

70.40

38.50

7.58

29.20

1797.12

69,189.12

Line 9

132.0

69.10

38.20

7.58

28.90

1797.12

68,649.98

Line 10

140.0

70.40

37.90

7.14

27.10

1693.44

64,181.38

Line 11

839.0

71.60

40.30

1.19

4.80

11.06

445.72

Line 12

824.0

72.90

40.40

1.21

4.90

12.32

497.73

Line 13

111.0

69.60

38.80

9.00

35.00

2090.88

81,126.14

Line 14

140.0

71.60

40.30

7.14

28.80

1693.44

68,245.63

Line 15

755.0

71.60

39.70

1.32

5.30

20.22

802.73

Line 16

932.0

72.90

41.40

1.07

4.40

5.66

234.32

Line 17

656.0

70.40

40.10

1.52

6.10

41.30

1656.13

Line 18

884.0

71.60

39.70

1.13

4.50

8.00

317.6