Heat required | 55,000 KWh/year |
Electricity required | 13,000 KWh/year |
Total energy required | 68,000 KWh/year |
Nominal power of PV system | 8.7 KWp |
Cost of PV system | 13,050 ?o:p> |
Power of solid biomass boiler | 68.75 KWth |
Cost of solid biomass boiler | 34,375 ?o:p> |
Quantity of solid biomass required | 15.8 tons/year |
Cost of required solid biomass | 1580 ?year |
Total capital cost of R.E. systems | 47,425 ?o:p> |