Date | Disconnection periods | Irra diance (W/m2) | Estimated Power (kW) | Grid absence duration | Lost energy (kWh) | ηpv (rendement) | K1 | K2 | K3 | K4 |
01/02/2017 | 9 h 17/9 h 25 | 215 | 365.897 | 0.133 | 48.786 | 3.194 | 0.980 | 0.970 | 0.900 | 0.992 |
12 h 10/12 h 24 | 768 | 1222.582 | 0.233 | 285.269 | 10.671 | 0.980 | 0.970 | 0.900 | 0.992 | |
12 h 46/12 h 53 | 276 | 465.970 | 0.117 | 54.363 | 4.067 | 0.980 | 0.970 | 0.900 | 0.992 | |
01/03/2017 | 10 h 02/10 h 08 | 476 | 786.072 | 0.100 | 78.607 | 6.861 | 0.980 | 0,970 | 0.900 | 0.992 |
01/04/2017 | 16 h 24/16 h 27 | 369 | 615.979 | 0.083 | 51.332 | 5.377 | 0.980 | 0.970 | 0.900 | 0.992 |
01/05/2017 | 9 h 38/9 h 44 | 430 | 714.914 | 0.100 | 71.491 | 6.236 | 0.980 | 0.970 | 0.900 | 0.992 |
01/06/2017 | 8 h 25/8 h 32 | 169 | 289.556 | 0.117 | 33.782 | 2.524 | 0.980 | 0.970 | 0.900 | 0.993 |
14 h 32/14 h 39 | 753 | 1203.390 | 0.117 | 140.395 | 10.482 | 0.980 | 0.970 | 0.900 | 0.994 | |
01/07/2017 | 9 h 58/10 h 05 | 522 | 860.147 | 0.117 | 100.351 | 7.487 | 0.980 | 0.970 | 0.900 | 0.994 |
10 h 22/10 h 28 | 630 | 1025.490 | 0.100 | 102.549 | 8.920 | 0.980 | 0.970 | 0.900 | 0.995 | |
10 h 38/11 h 15 | 684.87 | 1107.906 | 0.617 | 683.208 | 9.631 | 0.980 | 0.970 | 0.900 | 0.996 | |
01/08/2017 | 9 h 00/9 h 05 | 123 | 212.506 | 0.083 | 17.709 | 1.846 | 0.980 | 0.970 | 0.900 | 0.997 |
15 h 48/15 h 57 | 613 | 999.317 | 0.150 | 149.898 | 8.675 | 0.980 | 0.970 | 0.900 | 0.997 | |
01/09/2017 | 12 h 01/12 h 16 | 470.63 | 781.559 | 0.250 | 195.390 | 6.780 | 0.980 | 0.970 | 0.900 | 0.998 |
15 h 10/15 h 17 | 334.13 | 564.211 | 0.117 | 65.825 | 4.891 | 0.980 | 0.970 | 0.900 | 0.999 | |
15 h 22/15 h 29 | 282 | 479.438 | 0.117 | 55.934 | 4.153 | 0.980 | 0.970 | 0.900 | 0.999 | |
TOTAL |
|
|
| 2.55 | 2135 |
|
|
|
|
|