The hypothesized variables | Factor loading coefficients | Errors of variables | CR | AVE |
Risk from contracts (B1) Uncertain and unclear contract terms (b1.2) Transportation outside the construction site (b1.3) |
0.905 0.727 |
0.139 0.324 | 0.85
| 0.74
|
Risk from politics and law (B2) The relationship of investor and general contractor with the authority and relevant departments (b2.1) Laws and regulations of management agencies (b2.3) |
0.933 0.683 |
0.141 0.384 | 0.83
| 0.72
|
Risk from techniques (B3) Technical design (b3.1) Construction drawings (b3.3) Inspection of technical and drawings design (b3.4) |
0.727 0.705 0.682 |
0.467 0.493 0.502 | 0.75
| 0.51
|
Risk from natural conditions and social environment (B4) Geology, topography, and hydrography (b4.1) topography (b4.3) |
0.952 0.731 |
0.110 0.591 | 0.80
| 0.67
|
Risk from economy (B5) Finances of the investor (b5.1) Inflation (b5.3) Financial capacity of the contractors (b5.4) |
0.827 0.501 0.596 |
0.215 0.458 0.457 | 0.77
| 0.53
|
Risk from management (B6) Poor management of progress (b6.1) Construction items monitoring unit (b6.2) |
0.850 0.816 |
0.264 0.283 | 0.84
| 0.72
|
Risk from the EPC general contractors (B7) Purchasing materials, equipment, and machines (b7.1) Sub-contractor (b7.2) Equipment installation and commissioning (b7.3) |
0.756 0.693 0.636 |
0.287 0.416 0.423 | 0.79
| 0.56
|
Consequences of the risk factors (B8) Prolong the construction progress (b8.1) Increase construction costs (b8.2) |
1.038 0.501 |
0.063 0.576 | 0.79
| 0.68
|