Components

Mean

Interpretation

Do you check the size of the equipment room?

1.94

Sometimes

Do you check the grounding system?

2.03

Sometimes

Do you check the cable plan and layout of the system for the following:

Ÿ Inside Plant

2.31

Sometimes

Ÿ Outside Plant

2.03

Sometimes

Do you check the location of each of the equipment?

2.06

Sometimes

Do you check the RF signal level on the following:

Ÿ Main Amplifier

1.50

Never

Ÿ Distribution Amplifier

1.53

Never

Ÿ Modulator

1.56

Never

Do you check the safety and warning signs on the facility?

2.06

Sometimes

Do you check the tower specification? (if applicable)

2.19

Sometimes

Do you check the materials used in the system such as:

Ÿ Cable

1.88

Sometimes

Ÿ Antenna

1.81

Sometimes

Ÿ Transceiver System

1.75

Never

Overall Mean

1.90