Components | Mean | Interpretation |
Do you check the size of the equipment room? | 1.91 | Sometimes |
Do you check the grounding system? | 1.97 | Sometimes |
Do you check the plan and layout of cable for the following: |
|
|
Entrance Facilities | 2.03 | Sometimes |
Telco Enclosure | 1.94 | Sometimes |
Horizontal Cross Connect (Floor Distribution) | 1.91 | Sometimes |
Backbone (Riser) | 2.00 | Sometimes |
Horizontal Cabling (Distribution) | 1.97 | Sometimes |
Do you check the location of each of the equipment? | 1.88 | Sometimes |
Do you check the signal level? | 1.75 | Never |
Do you check the safety and warning signs on the facility? | 2.22 | Sometimes |
Do you check the tower specification? | 2.16 | Sometimes |
Do you check the materials used in the system such as: |
|
|
Cable | 1.91 | Sometimes |
Antenna | 1.94 | Sometimes |
Transceiver System | 1.88 | Sometimes |
Battery and Rectifier | 1.88 | Sometimes |
Do you check bandwidth specification of the system? | 1.81 | Sometimes |
Do you check the Fiber Optic Cable? (If applicable) | 1.94 | Sometimes |
Overall Mean | 1.94 | Sometimes |