DMA considered

New Zone connection option

Qmoy (l/s)

Pumping station involved

Actual flow capacity (l/s)

Bs (m3)

Tank involved

Actual volume capacity (m3)

All

-

264

S1

79 × 3 = 237

2 906

T1 or All

5000 or 9500

2 + 3

4 or 5

93

S2 + S3

70 + 96 = 166

1 035

T2 or T3 + T4

2000 or 1500

3 ? NZ

1

22

S2

35 × 2 = 70

237

T3

1000

3

2 or 3

30

S2

35 × 2 = 70

315

T3

1000

2

2 or 3

64

S3

48 × 2 = 96

729

T4

500

2 + NZ

1

71

S3

48 × 2 = 96

805

T4

500

5

-

32

S4

35 × 2 = 70

377

T5

500

4

-

38

S5

25 × 2 = 50

429

T6 + T7

500