Gen. Bus

No.

Before the outage

After the outage

Cost deviation ($/hr)

Generation (MW)

Cost ($/hr)

Generation (MW)

Cost ($/hr)

1

199.28

8915.04

130.00

9448.23

533.20

2

37.22

40.82

5

35.99

64.33

8

15.09

29.29

11

6.33

27.12

13

0

1.95