Gen. Bus No.

Before the outage

After the outage

Cost deviation

($/hr)

Generation (MW)

Cost ($/hr)

Generation (MW)

Cost ($/hr)

1

199.28

8915.04

129.88

9490.38

575.34

2

37.22

40.75

5

35.99

66.21

8

15.09

29.69

11

6.33

24.03

13

0

3.98