Locality

Sampling points

Description of sampling

Depth

Landfill Balaban

Monitoring wells (Piezometer (P1))

40 m opposite the entrance to the landfill

3 m

Monitoring wells (Piezometer (P2))

150 m to the right of the entrance to the landfill, with landfill body near the security fence

3 m

Schacht (Š3)

Schacht leachate, 1.20 m to the right of the entrance facility for control

3 m

Sewer (SK4)

Channel for collection leachate S1, S2, S3, S4, 50 m from the entrance

4 m

Unregulated landfill in Grabovac on the bank of river Ibar

The sample (G1)

Central part of unregulated landfill in Grabovac

1 m

The sample (G2)

Slope unregulated landfill in Grabovac on the right bank of the river Ibar

1.5 m

Unregulated landfill in

Žitkovac

The sample (Ž1)

The Northeast part of the landfill (3 m from the edge)

2 m

The sample (Ž2)

The Southeastern part of the landfill (3 m from the edge)

2 m