Grey class

Drilling work

(105 m)

Construction time

(103)

investment

(RMB 106)

Gas control cost

(Yuan/t)

Prevention of secondary disasters (%)

Best (I)

7.5

8.9

15.9

33.2

126

Better (II)

15

17.8

31.8

66.4

84

Bad (III)

22.5

26.7

47.7

99.6

42