Outburst prevention schemes | Drilling work (105 m) | Construction time (103) | Investment (106 yuan) | Gas control cost (yuan/t) | Prevention of secondary disasters |
Scheme I | 14.95 | 24.92 | 52.33 | 63.39 | Average (75) |
Scheme II | 13.54 | 13.54 | 20.31 | 53.29 | Better (80) |
Scheme III | 15.15 | 15.16 | 22.74 | 82.56 | Good (95) |