Dependent Variable: GDP

Method: Least Squares

Date: 05/10/16 Time: 12:21

Sample (adjusted): 1997 2014

Included observations: 15 after adjustments

Convergence achieved after 36 iterations

Variable

Coefficient

Std. Error

t-Statistic

Prob.

WATER

407.4889

672.7532

0.605703

0.5582

AIR

764.4963

253.3390

3.017681

0.0129

WASTE

354.8014

2963.157

0.119738

0.9071

C

159744.2

796551.5

0.200545

0.8451

AR (2)

−0.034794

0.582154

−0.059767

0.9535

R-squared

0.971901

Mean dependent var.

3,207,678

Adjusted R-squared

0.960661

S.D. dependent var.

2,980,805

S.E. of regression

591,214.3

Akaike info criterion

29.67895

Sum squared resid

3.50E + 12

Schwarz criterion

29.91496

Log likelihood

−217.5921

Hannan-Quinn criter.

29.67643

F-statistic

86.47036

Durbin-Watson stat

1.125781

Prob (F-statistic)

0.000000