Variable

Unit

Deduction criteria

Deducted score

Total deduction score of initial variables

Total deduction score of key variables

Geometry system

Elevation/mm

Unit

8

3

9

9

Gauge/mm

+8/−6

3

6

6

TQI

≥15

40

40

40

Total deduction score for geometry system

55

55

Rail system

Rail gap

position

More than three consecutive

3

6

0

Spalling and chipping

Depth > 2 mm

4

16

16

Abnormal light band

Length > 3 cm

3

6

6

Top surface scratch

Depth > 2 mm

3

6

0

Side wear

>6 mm

4

12

12

Total deduction score of rail system

46

34

Connecting part

Fastener missing

piece

Number of missing

2

8

8

Spike head falling-off

Falling off

2

4

0

Rubber gasket skewed

Skew

2

2

2

Rubber gasket broken

Break off

2

2

0

Total deduction score of connecting part system

16

10

Sleeper system

Break off

piece

Broken

2

2

0

Sleeper chipping

Chipping off

2

2

2

Number of sleepers

Less than specified number

2

4

4

Sleeper gap

Larger than structural gap

2

4

4

Total deduction score of sleeper system

12

10

Subgrade ballast

Thickness

Centimetre

>4/5, 3/5 - 4/5

4

4

4

Ballast bed smudging

Hole

Ballast bed smudging

2

4

4

Ballast bed compaction

Compaction

2

6

0

Ballast bed smudgy

position

Dirty

2

4

4

Total deduction score of subgrade ballast system

18

12

Total mass

Total mass of passing trains

Mass

Passing mass

20

20

20

Total deduction score of operating system

20

20