Variable | Unit | Deduction criteria | Deducted score | Total deduction score of initial variables | Total deduction score of key variables | |
Geometry system | Elevation/mm | Unit | 8 | 3 | 9 | 9 |
Gauge/mm | +8/−6 | 3 | 6 | 6 | ||
TQI | ≥15 | 40 | 40 | 40 | ||
Total deduction score for geometry system |
| 55 | 55 | |||
Rail system | Rail gap | position | More than three consecutive | 3 | 6 | 0 |
Spalling and chipping | Depth > 2 mm | 4 | 16 | 16 | ||
Abnormal light band | Length > 3 cm | 3 | 6 | 6 | ||
Top surface scratch | Depth > 2 mm | 3 | 6 | 0 | ||
Side wear | >6 mm | 4 | 12 | 12 | ||
Total deduction score of rail system |
| 46 | 34 | |||
Connecting part | Fastener missing | piece | Number of missing | 2 | 8 | 8 |
Spike head falling-off | Falling off | 2 | 4 | 0 | ||
Rubber gasket skewed | Skew | 2 | 2 | 2 | ||
Rubber gasket broken | Break off | 2 | 2 | 0 | ||
Total deduction score of connecting part system |
| 16 | 10 | |||
Sleeper system | Break off | piece | Broken | 2 | 2 | 0 |
Sleeper chipping | Chipping off | 2 | 2 | 2 | ||
Number of sleepers | Less than specified number | 2 | 4 | 4 | ||
Sleeper gap | Larger than structural gap | 2 | 4 | 4 | ||
Total deduction score of sleeper system |
| 12 | 10 | |||
Subgrade ballast | Thickness | Centimetre | >4/5, 3/5 - 4/5 | 4 | 4 | 4 |
Ballast bed smudging | Hole | Ballast bed smudging | 2 | 4 | 4 | |
Ballast bed compaction | Compaction | 2 | 6 | 0 | ||
Ballast bed smudgy | position | Dirty | 2 | 4 | 4 | |
Total deduction score of subgrade ballast system |
| 18 | 12 | |||
Total mass | Total mass of passing trains | Mass | Passing mass | 20 | 20 | 20 |
Total deduction score of operating system |
| 20 | 20 |