1 | Start Project |
2 | Workshop equipment |
3 | Excavation |
4 | Revetment |
5 | Performing lean concrete |
6 | Foundation and structure work |
7 | Roof insulation |
8 | Door frame Slope roof |
9 | Run drains |
10 | Plaster and white wash |
11 | Performing electrical facilities |
12 | Concrete flooring and Stained concrete work |
13 | Bath room insulation |
14 | Floor ceramic and tile work |
15 | Installing elevator guide rail |
16 | Outlook painting |
17 | Installing windows |
18 | Performing the pipes and electrical installation |
19 | Performing fire sprinklers |
20 | Gas piping |
21 | Masonry of area and stares |
22 | Installing elevator |
23 | Performing non-structural ceiling |
24 | Installing fence and metal doors |
25 | Installation of wooden doors |
26 | Internal painting |
27 | Dismantling workshop |
28 | Finish |