Economic growth | Upgrading industrial structure | ||
lngdp = 0.197 lnex + 0.905 lnim (3.0406) (17.8610) | Log likelihood = 98.1015 | lnind = 0.903 lnex (6.5955) | Log likelihood = 53.18124 |
lngdp = 0.238 lnfdi + 10.923 (8.0458) (26.7819) | Log likelihood = 32.2361 | lnsev = 1.041 lnim − 0.541 lnex (9.5062) (−7.4565) | Log likelihood = 99.6814 |
lngdp = 1.675 lnexse (31.4023) | Log likelihood = 59.4302 | lnsev = 0.267lnfdi (12.2896) | Log likelihood = 33.87457 |
|
| lnsev = 1.804lnexse (24.9109) | Log likelihood = 52.31973 |