Geotechnical Investigation Result on Section of Ogbia-Nembe Road for Improved Soil Sample | Geotechnical Investigation Result on Section of Ogbia-Nembe Road for Improved Soil Sample | Geotechnical Investigation Result on Section of Ogbia-Nembe Road for Improved Soil Sample | ||||||||||
Sample Point | Standard Compaction | California Bearing Ratio (CBR) (%) | Sample Point | Standard Compaction | California Bearing Ratio (CBR) (%) | Sample Point | Standard Compaction | California Bearing Ratio (CBR) (%) | ||||
Maximum Dry Density (g/cm3) | Optimum Moisture Content (OMC) % | Soaked CBR Value (%) | Maximum Dry Density (g/cm3) | Optimum Moisture Content (OMC) % | Soaked CBR Value (%) | Maximum Dry Density (g/cm3) | Optimum Moisture Content (OMC) % | Soaked CBR Value (%) | ||||
At 6% Cement Content on a sand-cement stabilization | At 10% Cement Content on a sand-cement stabilization | At 10% Cement Content on a sand-cement stabilization | ||||||||||
A | 1.66 | 8.30 | 27.30 | A | 1.56 | 9.30 | 26.40 | A | 1.52 | 10.30 | 31.00 | |
B | 1.74 | 10.10 | 21.80 | B | 1.69 | 11.20 | 28.10 | B | 1.68 | 12.00 | 33.10 | |
C | 1.78 | 12.30 | 29.70 | C | 1.78 | 13.10 | 36.80 | C | 1.75 | 14.20 | 32.00 | |
D | 1.71 | 14.30 | 31.30 | D | 1.74 | 15.20 | 31.30 | D | 1.67 | 16.10 | 36.00 | |
E | 1.62 | 16.20 | 17.30 | E | 1.58 | 17.20 | 32.40 | E | 1.52 | 18.30 | 36.40 | |
At 8% Cement Content on a sand-cement stabilization | At 12% Cement Content on a sand-cement stabilization | At 12% Cement Content on a sand-cement stabilization | ||||||||||
A | 1.59 | 6.20 | 33.40 | A | 1.61 | 8.40 | 38.60 | A | 1.61 | 9.20 | 38.70 | |
B | 1.69 | 8.20 | 29.80 | B | 1.76 | 10.30 | 38.10 | B | 1.69 | 11.30 | 39.20 | |
C | 1.70 | 10.20 | 33.70 | C | 1.84 | 12.10 | 43.20 | C | 1.74 | 13.20 | 37.60 | |
D | 1.63 | 12.00 | 35.20 | D | 1.73 | 14.10 | 39.90 | D | 1.67 | 15.30 | 41.90 | |
E | 1.49 | 14.20 | 29.20 | E | 1.61 | 16.00 | 44.40 | E | 1.57 | 17.30 | 42.80 | |
At 10% Cement Content on a sand-cement stabilization | At 14% Cement Content on a sand-cement stabilization | At 14% Cement Content on a sand-cement stabilization | ||||||||||
A | 1.64 | 6.20 | 43.00 | A | 1.66 | 6.20 | 42.10 | A | 1.65 | 5.40 | 42.30 | |
B | 1.70 | 8.30 | 42.60 | B | 1.78 | 8.20 | 43.60 | B | 1.70 | 7.30 | 41.70 | |
C | 1.73 | 10.10 | 43.30 | C | 1.86 | 10.10 | 44.80 | C | 1.72 | 9.40 | 39.00 | |
D | 1.65 | 12.20 | 45.20 | D | 1.80 | 12.20 | 40.90 | D | 1.67 | 11.30 | 35.10 | |
E | 1.58 | 14.00 | 39.40 | E | 1.64 | 14.20 | 48.20 | E | 1.61 | 13.10 | 45.20 |