Floor Type

Optimised Concrete

per Floor (m3 C30)

Original Concrete per Floor (m3 C30)

Number of Floors

Total Concrete Saved

(m3 C30)

2nd Floor

128.5

139.8

31

361.8

15th Floor

131.8

143.3

1