Crushed dolerite Method

Fines Method

The material was sampled directly from the base layers of the road pavements and test results were compared with test results of materials that were obtained from the quarries.

Two sets of quarry fines (old and fresh) were obtained. The sampled fines included dust that was not exposed to the elements and the dust that was exposed to the elements for more than three months where it was present.