Case No. | Contingency type | Congested lines | Power flow in line (MW) | percentage overload | Net power violation (MW) |
Case 2.1 | Simulating overload by capacity reduction of the lines between buses 5&6 and 6&12. | 5 - 6 6 - 12 | 184.62 46.985 | 5.49 34.24 | 21.605 |
Case 2.2 | Simulating overload by capacity reduction of the-lines between buses 5&6 and 6&12. | 2 - 3 | 38.6 | 93 | 18.6 |