Parameters | Approaches | ||
Hybrid TLBO-PSO [Proposed] | TLBO [1] | PSO [8] | |
Congestion cost ($/h) | 100.69 | 494.66 | 538.95 |
ΔPG1 | −16.3312 | −8.5876 | −8.6123 |
ΔPG2 | −4.0577 | +12.9855 | +10.4059 |
ΔPG3 | −2.0659 | +0.4598 | +3.0344 |
ΔPG4 | −7.2759 | +0.7289 | +0.0170 |
ΔPG5 | −2.5654 | −0.0093 | +0.8547 |
ΔPG6 | −2.6203 | +0.3988 | −0.0122 |
Total power rescheduled (MW) | 34.9165 | 23.169 | 22.936 |