The project materials

Quantity

Unit price (US$)

Total price (US$)

A. Water capturing system and water storage

Construction of water tanks (1 reservoir build at the water source level and 1 water tower)

2

6550

13,100

Water capturing activities

1

750

750

Water pump

3

4375

13,125

Fencing 54 m2

1

5212

5212

Sub total

32,187

B. Piping system (from pump to storage tank)

PVC pipe 1.5 inch

150

5.2

780

PVC Pipes 1 inch

200

5

1000

PVC pipes 3/4 inch

6

3.7

22.2

PVC TEE flow through run

3

0.8

2.4

PVC TEE flow through run 1 inch

6

0.8

4.8

Union fitting 1 inch

9

1

9

Union fitting 3/4 inch

6

0.85

5.1

Reduction 1 to 3/4 inch

4

0.79

3.16

PVC 900 elbow 1.5 inch

0

0.5

0

900 elbow 3/4 inch

9

0.45

4.05

900 elbow 1 inch

6

0.5

3

Insert coupling 1 inch

294

0.65

191.1

Insert coupling 3/4 inch

6

0.58

3.48

Gate valve

3

2.8

8.4

Ball valve 3/4 inch

3

2.1

6.3

Ball valve 1 inch

3

2.5

7.5

Union fitting 1.5 inch

2

0.95

1.9

Ball valve 1.5 inch

2

2.89

5.78

Check valve 1.5 inch

2

3

6

Male-female adaptor

2

0.6

1.2

Miscellaneous plumbing material

206.53

Sub total

2271.9

C. PV solar system

PV Solar arrays (240 W)

6 PV solar arrays per pump x3 = 18

460

8280

PV solar accessories (controllers, racks, Steel election materials,

floats switch, switches and fuses…..)

1

7830

7830

Sub total

16,110

D. Installation costs

1

830

830

E. Operation and maintenance

1600

F. Capacity building (training…..)

1100

Total investment cost (taxes) excluded)

54098.9