WT

Hilltop (m AGL)

Hub height (m)

PeR (kW)

Pe,ave (kW)

Cf (%)

Eout (MW-hr/yr)

COE (US $/kW-hr)

AOC/10 kW

150

37

9.7

3.74

38.59

31.12

0.169

350

37

9.7

3.75

38.69

31.21

0.169

P12-25

150

36.6

25

10.48

41.92

87.21

0.106

350

36.6

25

14.23

56.92

118.42

0.078

P15-50

150

50

50

24.19

48.36

201.31

0.092

350

50

50

28.86

57.72

240.17

0.077

P25-100

150

45.7

100

47.52

47.52

395.46

0.094

350

45.7

100

57.22

57.22

476.18

0.078

E-33/330

150

50

330

115.06

34.87

957.53

0.082

350

50

330

147.12

44.58

1224.33

0.065

V47-660

150

45

660

173.97

26.33

1447.78

0.110

350

45

660

195.36

29.60

1625.79

0.098

E48-800

150

70

800

251.76

31.47

2095.15

0.092

350

70

800

321.89

40.24

2678.77

0.072

YDF-1500

150

75

1500

761.48

47.72

6337.04

0.057

-87

350

75

1500

862.91

56.86

7181.14

0.050

S95-2.1 MW

150

80

2100

899.81

42.85

7488.22

0.067

350

80

2100

1087.55

51.79

9050.59

0.056

V90-3 MW

150

80

3000

834.76

27.83

6946.87

0.104

350

80

3000

1082.17

36.07

9005.82

0.080