Scenario | Description | 2038 | 2070 | ||
Np (Mbbl) | Wp (Mbbl) | Np (Mbbl) | Wp (Mbbl) | ||
Base case | Four existing production wells | 6376.93 (15.24%) | 1394.14 | 6388.35 (15.26%) | 1420.71 |
Water injection | Four existing production wells + one injector | 7363.03 (17.59%) | 12468.15 | 8929.06 (21.33%) | 41629.87 |
Polymer injection | Four existing production wells + one injector | 8196.42 (19.58%) | 4036.27 | 12860.71 (30.73%) | 30087.67 |