WORKSTATION 8: INSPECTION

TASK DESCRIPTION

TASK CODE

PROCESSING TIME IN SECONDS

END OF LINE INSPECTION

G3

13.9

ROLLING ROD

G4

162.8

EMISSION ANALYSIS

G5

37.9

CO & OIL TEMPERATURE

H1

119.3

TOTAL

333.9

CYCLE TIME

576

WORKERS

5

BALANCING LOSS

42%

UTILIZATION

58%

IDLE TIME

242.1