WORKSTATION 5: BRAKE BLEEDING | ||
TASK DESCRIPTION | TASK CODE | PROCESSING TIME IN SECONDS |
BRAKE FLUID TOPPING & BLEEDING 1 | D5 | 114.7 |
BRAKE FLUID TOPPING & BLEEDING 2 | E1 | 139.5 |
BRAKE FLUID TOPPING & BLEEDING 3 | E2 | 127.1 |
TOTAL | 381.3 | |
CYCLE TIME | 576 | |
WORKERS | 3 | |
BALANCING LOSS | 33.9% | |
UTILIZATION | 66.1% | |
IDLE TIME | 194.7 |