WORKSTATION 4: ENGINE PREPARATION | ||
TASK DESCRIPTION | TASK CODE | PROCESSING TIME IN SECONDS |
EXHAUST/MUFFLER FITMENT | A2 | 135.5 |
DRIVE SHAFT FITMENT | A3 | 111.5 |
AIR BOX FITMENT | A4 | 77.7 |
FRONT CROSS MEMBER | A5 | 67.1 |
GEAR OIL | C3 | 45.3 |
TOTAL | 437.1 | |
CYCLE TIME | 576 | |
WORKERS | 4 | |
BALANCING LOSS | 24.1% | |
UTILIZATION | 75.9% | |
IDLE TIME | 138.9 |