Factor | Frequency of the factor visualization at the worksite | ||||
Always | Often | Sometimes | Seldom | Never | |
Blocks/Bricks are not cut for modulation adjustment | X |
|
|
|
|
Blocks/Bricks of good quality | X |
|
|
|
|
Blocks/Bricks palletized | X |
|
|
|
|
Sending of a precise number of blocks/bricks to the work fronts | X |
|
|
|
|
Existence of a masonry design, the constructive solutions are not improvised | X |
|
|
|
|
Use of tools and techniques adequate for cutting the block/brick |
| X |
|
|
|
Factor | Frequency of visualization of the factor at the worksite | ||||
Always | Often | Sometimes | Seldom | Never | |
Existence of quality control and quantity at the reception of the block/brick | X |
|
|
|
|
After settling the walls are not sectioned for installations |
|
| X |
|
|
There is no considerable destruction of blocks/bricks in transportation or execution | X |
|
|
|
|
Organization of the worksite, facilitating material movement | X |
|
|
|
|