Factor | Frequency of visualization of the factor at the worksite | ||||
Always | Often | Sometimes | Seldom | Never | |
Accurate estimate of the volume of concrete to be used | X |
|
|
|
|
Use of specific design for masonry | X |
|
|
|
|
Good accommodation of mortar in stock, no action of humidity | X |
|
|
|
|
Use of older sacks before the most recent | X |
|
|
|
|
Mortar not unloaded on the floor |
| X |
|
|
|
No over-thickness of the horizontal joints of the masonry |
| X |
|
|
|
No over width of the vertical joints of the masonry |
| X |
|
|
|
Use of specific tools for settlement, such as tubes and boards | X |
|
|
|
|
Transport of mortar by appropriate ways and/or equipment for such | X |
|
|
|
|
Reutilization of mortar that falls on the floor |
| X |
|
|
|
It is necessary to settle until the mortar is over | X |
|
|
|
|
Encouragement of workers to minimize wastes | X |
|
|
|
|
Good operation of the transport elements mortar | X |
|
|
|
|